Prepare damp proof before laying on the floor, which is more conducive to the moisture-proof effect of the floor in the future. Material handling, ground treatment can not be ignored in every aspect,Co-Extruded Floor Supplier
do every moisture-proof link, so that the paved floor is both beautiful and durable.
Material preservation is very important. Flooring materials should be laid at room temperature for two days before paving. For better moisture protection,diy low cost flooring

the floor should be stored in a dry and ventilated place and protected by a plastic film. If the purchased materials are already wet, they can't be reused. Don't try to save money,and then use the damp floor to dry. Such a floor is not only easy to mold, but also greatly shortened its service life.
The material should be treated with moisture. The floor that was bought back also had a moisture-proof treatment before laying. Apply a layer of moisture-proof protective paint on the opposite side of the floor to prevent the wet surface of the floor from affecting the floor,cost effective outdoor garage floor

resulting in floor emptying.
The floor needs to be cleaned before laying. Whether paving solid wood flooring or composite wood flooring. The floor of the room must be treated first. The cement on the ground must be cleaned first,green wood plastics and composites

the putty should be scraped, and the floor should be kept as flat as possible. Then the floor should be cleaned to remove grease or dust on the floor surface to ensure the floor is clean. If the second-hand house is plastered on the floor, the ground putty should be scraped off. It is better to brush a thin layer of cement slurry before removing the plaster to remove stains from the floor and allow the cement to dry before paving.
Before the floor is laid, in order to ensure the moisture-proof effect, the ground must be treated with a waterproof and moisture-proof treatment, especially near the kitchen and bathroom. The waterproof material on the ground shall be evenly painted,where to buy wpc decking for cheap

and the crevices shall be filled with paint or cement brush. If there is a water-proof material near the floor near the water pipe, it must be painted at a height of 30 cm near the water pipe. Generally, the ground layer moisture content must not exceed 15%.